top of page

Resultados da pesquisa

28 resultados encontrados com uma busca vazia

  • News | Burlington High School

    Project milestones and important documents NOTÍCIAS + OUTRAS INFORMAÇÕES Em breve!

  • SBC Meetings & Recordings | Essex ES

    Materiais e gravações da reunião da SBC 2025 Reunião SBC nº 13 - 13 de fevereiro de 2025 SBC Meeting No. 1 - Recording - APR 29, 2025 SBC Meeting No. 1 - DRAFT Minutes - APR 29, 2025

  • Project Finances | Essex ES

    Documentos de estimativa do PDP

  • Schematic Design | Essex ES

    Schematic Design Based upon the completed Feasibility Study, the District and its team, in collaboration with the MSBA, develop a robust schematic design of sufficient detail to establish the scope, budget and schedule for the Proposed Project. The project team will create a set of Schematic Design drawings and specifications to help create the final & total project budget.

  • Monthly Reports | Essex ES

    Relatórios mensais do projeto Dore & Whittier, gerente de projeto do proprietário, produz um relatório mensal detalhando o status do projeto. 2025 November October September

  • ANRAD | Essex ES

    ANRAD/ORAD Ver ANRAD

  • Construction | Essex ES

    Construction During construction, the District and its team continue to collaborate with the MSBA to report on the progress of the project and to confirm that it remains on schedule and within budget, and meets the expectation of both the District and the MSBA as defined in the Project Funding Agreement ("PFA"). Module 7 – Construction , provides information districts will need to: process Reimbursement Requests into the Pro-Pay System ; reconcile its Total Project Budget in an Amendment to the PFA to account for the actual construction costs based on executed bid/Guaranteed Maximum Price ("GMP"); and submit change orders and GMP Contingency Expenditures consideration for eligibility using the Change Order Review Log and the GMP Contingency Log . In addition to keeping the budget up to date in Pro-Pay, the District must also maintain an up-to-date project schedule, submitted monthly by the OPM together with the OPM Report. Within two weeks of the District’s approval of the General Contractor’s or Construction Manager’s construction schedule, the project schedule should be updated to contain all of the schedule activities required by Module 4 – Schematic Design, Section 4.1.2 , plus the additional enumerated Module 7 Schedule Activities . This project schedule must be kept up-to-date and submitted to the MSBA monthly with the OPM Report.

  • Preliminary Design Program | Essex ES

    Preliminary Design Program Alternatives Please see below to view the proposed alternatives for the PDP. These consist of base building repairs, additions/renovations, & new construction options. These also span across both the current Essex Elementary School site and the Manchester Memorial Elementary School site along with covering multiple grade configurations

  • Existing Conditions | Essex Elementary School

    Existing school facility conditions and issues CONDIÇÕES EXISTENTES 1/26 Habeeb Report - 2023

  • Abutters Redirect | Essex ES

    Participe da reunião aqui às 6h30 do dia 26 de fevereiro: https://townofburlington.webex.com/townofburlington/j.phpMTID=m4a3f9286f127effb35b31667fb7b103az Participe pelo número da reunião: Número da reunião (código de acesso): 2347 212 6765 Senha da reunião: Burlington

  • Design e Documentação do Projeto | Essex ES

    Reuniões da SBC Ver materiais da reunião da SBC Relatórios mensais Ver relatórios mensais Condições existentes Ver condições existentes Project Documents View Project Documents

Logotipo DW - Color_Combined Logo.png

© 2024 Distrito escolar de Burlington

bottom of page