- Feasibility Study | Essex ES
Feasibility Study The purpose of the Feasibility Study is for the District, its OPM (for projects with estimated construction costs in excess of $1.5 million), its Designer, and the MSBA to explore potential solutions that meet the requirements of the District’s Educational Program, and to determine the most cost effective and educationally appropriate solution for the MSBA Board of Directors' consideration. The Feasibility Study consists of the Preliminary Design Program (PDP) & The Preferred Schematic Report (PSR). Preliminary Design Program Key Goals Identify the issues/articulate the educational plan List options to be studied in PSR Generate an initial space summary Document existing conditions Establish design parameters View PDP Alternatives Preferred Schematic Report Key Goals Develop and evaluate alternatives. Recommend the most cost effective and educationally appropriate preferred solution to the MSBA Board of Directors for their consideration. View PSR Alternatives
- MERSD Essex Elementary School Building Project
Learn more about the Essex Elementary School building project. BEM-VINDO Nós encorajamos vocêexplorar o site para obter informações adicionais sobre o projeto da Burlington High School e seu impacto na cidade e como envolve a comunidade SOBRE Próxima reunião Reunião nº 5 do Comitê de Construção da Escola Secundária de Burlington 11 de abril de 2024 às 18h30 Link da reunião: Para ser anunciado.
- Existing Conditions | Essex Elementary School
Existing school facility conditions and issues CONDIÇÕES EXISTENTES 1/26 Habeeb Report - 2023
- ANRAD | Essex ES
ANRAD/ORAD Ver ANRAD
- Preliminary Design Program | Essex ES
Preliminary Design Program Alternatives Please see below to view the proposed alternatives for the PDP. These consist of base building repairs, additions/renovations, & new construction options. These also span across both the current Essex Elementary School site and the Manchester Memorial Elementary School site along with covering multiple grade configurations
- SBC Meetings & Recordings | Essex ES
Materiais e gravações da reunião da SBC 2025 Reunião SBC nº 13 - 13 de fevereiro de 2025 SBC Meeting No. 1 - Recording - APR 29, 2025 SBC Meeting No. 1 - DRAFT Minutes - APR 29, 2025
- Monthly Reports | Essex ES
Relatórios mensais do projeto Dore & Whittier, gerente de projeto do proprietário, produz um relatório mensal detalhando o status do projeto. 2025 November October September
- Design Options & Site Context Plan | Essex ES
Opções de design Coming Soon!
- Preferred Schematic Report | Essex ES
Preferred Schematic Report PSR is scheduled to begin in Winter 2026