- Schedule | Essex Elementary School
आगामी कार्यक्रम Click Here for the Master Meeting List एसबीसी बैठक सामग्री देखें आगामी कुछ महत्वपूर्ण बैठकों की सूची नीचे देखें! आगामी बैठक की तिथियां
- Essex Elementary School Building Project | Essex Elementary School | 12 Story Street, Essex, MA, USA
The project website for the Essex Elementary School Building Project. This website will host everything related to the project along with all Massachusetts School Building Authority & School Building Committee documents. Welcome Please explore the page and click the "About" link below to learn more about the project! About Essex Elementary School Next Upcoming SBC Meeting SBC Meeting No. 15 Date: March 10, 2026 Time: 6:00PM https://us06web.zoom.us/j/86278873513 Check out some quick links below! Summary of Meetings This link will take you to a frequently updated list of meetings agendas, presentations, recordings, & minutes Master Calender This link will take you to a frequently updated list of all planned public meetings Monthly Reports This link will take you to the monthly report page - issued around the 12th of each month
- Cost | Essex ES
लागत हमारा अनुमान है कि इस परियोजना की कुल लागत 21.6 मिलियन डॉलर होगी। परियोजना के लिए अंतिम बजट लागत को योजनाबद्ध डिजाइन के दौरान पूरा किया जाएगा और 2021 की शरद ऋतु में स्वीकृति के लिए नगर परिषद को प्रस्तुत किया जाएगा। पात्र बनाम अपात्र लागत एमएसबीए प्रतिपूर्ति किसी भी के लिए 54.79% हैयोग्य खर्चे। परियोजना में ऐसी कई चीजें हैं जो प्रतिपूर्ति के लिए पात्र नहीं हैं या अधिकतम पात्रता सीमा से अधिक हैं। उदाहरण के लिए, 8% से अधिक साइट लागत पात्र नहीं हैं। हम अनुमान लगा रहे हैं कि पात्र/अपात्र लागतों की गणना के बाद लगभग 40% प्रतिपूर्ति प्राप्त होगी।
- Detailed Design | Essex ES
Detailed Design & Construction Documents The District and its team continue to advance the project and the MSBA continues to monitor the project to ensure it remains on track and meets the expectation of both the District and the MSBA as defined in the Project Funding Agreement. In general terms, the MSBA ensures that the project team works within the requirements contained in the MSBA’s Base Contracts and Base Contract Amendments for Owner's Project Managers (OPM) and Designer Services . Additionally, the MSBA assigns a Commissioning Consultant to the project who facilitates an intensive quality assurance process and ensures that the new or renovated building operates efficiently and as the owner intended. Specifically, the District and its team generate construction documents which are reviewed by the MSBA in accordance with the requirements prescribed in the above-mentioned contracts.
- Preferred Schematic Report | Essex ES
Preferred Schematic Report PSR is scheduled to begin in Winter 2026
- परियोजना डिजाइन और दस्तावेज़ | Essex ES
एसबीसी बैठकें एसबीसी बैठक सामग्री देखें मासिक विवरण मासिक रिपोर्ट देखें मौजूदा परिस्थितियां मौजूदा स्थितियां देखें Project Documents View Project Documents
- Feasibility Study | Essex ES
Feasibility Study The purpose of the Feasibility Study is for the District, its OPM (for projects with estimated construction costs in excess of $1.5 million), its Designer, and the MSBA to explore potential solutions that meet the requirements of the District’s Educational Program, and to determine the most cost effective and educationally appropriate solution for the MSBA Board of Directors' consideration. The Feasibility Study consists of the Preliminary Design Program (PDP) & The Preferred Schematic Report (PSR). Preliminary Design Program Key Goals Identify the issues/articulate the educational plan List options to be studied in PSR Generate an initial space summary Document existing conditions Establish design parameters View PDP Alternatives Preferred Schematic Report Key Goals Develop and evaluate alternatives. Recommend the most cost effective and educationally appropriate preferred solution to the MSBA Board of Directors for their consideration. View PSR Alternatives
- News | Burlington High School
Project milestones and important documents समाचार + अन्य जानकारी जल्द आ रहा है!
- Existing Conditions | Essex Elementary School
Existing school facility conditions and issues मौजूदा परिस्थितियां 1/26 Habeeb Report - 2023
- About | Essex Elementary School
के बारे में In January 2023, the MSBA (Massachusetts School Building Authority) recommended and approved the Essex Elementary School for admission into the Eligibility Phase of the MSBA grant process. Being accepted means the MERSD Essex Elementary School has been identified as being one of the neediest schools in the state (close to being out of options to address the structural issues of the building) and a good candidate for the grant program. The MSBA grant program provides technical assistance and financial support (a minimum of 30% reimbursement) for the planning and construction of a new/renovated school. Acceptance into the program comes at a critical time. In the fall of 2022, MERSD commissioned Habeeb & Associates to conduct a needs assessment of both facilities to provide a data-based resource to guide in the development of a timeline to address the replacement of Essex Elementary School. The results were reported to the community in November 2022 and clearly showed that Essex Elementary has passed its useful life. The study identified approximately $9 million in capital investments needed to maintain the aging facility. (Habeeb Report ’23 ) Essex Elementary School is a 67 year-old building that the MSBA has identified as “being “being almost out of options” to address structural deficiencies Obsolete architectural and mechanical systems contribute to excessive operational and maintenance costs Unfavorable learning environment with a leaking roof, single pane windows, outdated lighting, and ventilation/heating systems Inadequate size and inefficient arrangement of academic and administrative space with converted locker rooms and closets being used for office and instructional space and limited special education and meeting venues Instructional limitations due to the lack of appropriate instructional space Non-compliant handicapped accessibility Participation in the MSBA program will allow MERSD to work with the MSBA team of experts to conduct a feasibility study to determine the most cost-effective solution for providing a renovated/rebuilt facility. A Feasibility Study is Necessary Because: This is a requirement of the MSBA to qualify for state-funded reimbursement for any future building project, including renovation Creates a transparent process that investigates potential options and provides multiple solutions for the town to consider, including cost estimates and schematic designs for repair, renovation, or new construction Provides the school, town officials, and voters the facts needed to make educated decisions about the future of the school and, more importantly, the students it serves
- Construction | Essex ES
Construction During construction, the District and its team continue to collaborate with the MSBA to report on the progress of the project and to confirm that it remains on schedule and within budget, and meets the expectation of both the District and the MSBA as defined in the Project Funding Agreement ("PFA"). Module 7 – Construction , provides information districts will need to: process Reimbursement Requests into the Pro-Pay System ; reconcile its Total Project Budget in an Amendment to the PFA to account for the actual construction costs based on executed bid/Guaranteed Maximum Price ("GMP"); and submit change orders and GMP Contingency Expenditures consideration for eligibility using the Change Order Review Log and the GMP Contingency Log . In addition to keeping the budget up to date in Pro-Pay, the District must also maintain an up-to-date project schedule, submitted monthly by the OPM together with the OPM Report. Within two weeks of the District’s approval of the General Contractor’s or Construction Manager’s construction schedule, the project schedule should be updated to contain all of the schedule activities required by Module 4 – Schematic Design, Section 4.1.2 , plus the additional enumerated Module 7 Schedule Activities . This project schedule must be kept up-to-date and submitted to the MSBA monthly with the OPM Report.
- Preliminary Design Program | Essex ES
Preliminary Design Program Alternatives Please see below to view the proposed alternatives for the PDP. These consist of base building repairs, additions/renovations, & new construction options. These also span across both the current Essex Elementary School site and the Manchester Memorial Elementary School site along with covering multiple grade configurations