  • Preferred Schematic Report | Essex ES

    Preferred Schematic Report PSR is scheduled to begin in Winter 2026

  • Existing Conditions | Essex Elementary School

    Existing school facility conditions and issues ĐIỀU KIỆN HIỆN TẠI 1/26 Habeeb Report - 2023

  • ANRAD | Essex ES

    ANRAD/ORAD Xem ANRAD

  • SBC Meetings & Recordings | Essex ES

    Tài liệu và bản ghi cuộc họp của SBC 2025 Cuộc họp SBC số 13 - 13 tháng 2 năm 2025 SBC Meeting No. 1 - Recording - APR 29, 2025 SBC Meeting No. 1 - DRAFT Minutes - APR 29, 2025

  • Schematic Design | Essex ES

    Schematic Design Based upon the completed Feasibility Study, the District and its team, in collaboration with the MSBA, develop a robust schematic design of sufficient detail to establish the scope, budget and schedule for the Proposed Project. The project team will create a set of Schematic Design drawings and specifications to help create the final & total project budget.

  • Design Options & Site Context Plan | Essex ES

    Tùy chọn thiết kế Coming Soon!

  • Monthly Reports | Essex ES

    Báo cáo dự án hàng tháng Dore & Whittier, Quản lý dự án của Chủ sở hữu, lập báo cáo hàng tháng nêu chi tiết tình trạng của dự án. 2025 November October September

  • Preliminary Design Program | Essex ES

    Preliminary Design Program Alternatives Please see below to view the proposed alternatives for the PDP. These consist of base building repairs, additions/renovations, & new construction options. These also span across both the current Essex Elementary School site and the Manchester Memorial Elementary School site along with covering multiple grade configurations

  • Feasibility Study | Essex ES

    Feasibility Study The purpose of the Feasibility Study is for the District, its OPM (for projects with estimated construction costs in excess of $1.5 million), its Designer, and the MSBA to explore potential solutions that meet the requirements of the District’s Educational Program, and to determine the most cost effective and educationally appropriate solution for the MSBA Board of Directors' consideration. The Feasibility Study consists of the Preliminary Design Program (PDP) & The Preferred Schematic Report (PSR). Preliminary Design Program Key Goals Identify the issues/articulate the educational plan List options to be studied in PSR Generate an initial space summary Document existing conditions Establish design parameters View PDP Alternatives Preferred Schematic Report Key Goals Develop and evaluate alternatives. Recommend the most cost effective and educationally appropriate preferred solution to the MSBA Board of Directors for their consideration. View PSR Alternatives

  • MERSD Essex Elementary School Building Project

    Learn more about the Essex Elementary School building project. CHÀO MỪNG Chúng tôi ủng hộ bạn để khám phá trang web để biết thêm thông tin về dự án Trường Trung học Burlington và tác động của nó đối với thị trấn cũng như cách nó liên quan đến cộng đồng VỀ Cuộc họp sắp tới Cuộc họp Ủy ban Xây dựng Trường Trung học Burlington lần thứ 5 Ngày 11 tháng 4 năm 2024 @ 6:30 chiều Liên kết cuộc họp: Để được công bố.

  • Cost | Essex ES

    TRỊ GIÁ Hiện tại chúng tôi ước tính tổng chi phí cho dự án là 21,6 triệu USD. Chi phí ngân sách cuối cùng cho dự án sẽ được hoàn thành trong quá trình Thiết kế Sơ đồ và trình lên Hội đồng Thành phố để phê duyệt vào Mùa thu năm 2021. ĐỦ ĐIỀU KIỆN VS. CHI PHÍ KHÔNG HỢP LÝ Khoản hoàn trả của MSBA là 54,79% cho bất kỳĐẠT CHUẨN chi phí. Có một số thứ trong dự án không đủ điều kiện để được hoàn trả hoặc vượt quá giới hạn đủ điều kiện tối đa. Ví dụ: chi phí trang web trên 8% không đủ điều kiện. Chúng tôi ước tính ~ 40% số tiền hoàn trả sau khi tính toán các chi phí đủ điều kiện/không đủ điều kiện.