top of page

Mga Resulta ng Paghahanap

28 resulta ang natagpuan na walang laman ng paghahanap

  • Schedule | Essex Elementary School

    Mga paparating na kaganapan Click Here for the Master Meeting List Tingnan ang SBC Meeting Materials Tingnan sa ibaba ang listahan ng ilan sa mahahalagang paparating na pagpupulong! Mga paparating na petsa ng pagpupulong

  • Essex Elementary School Building Project | Essex Elementary School | 12 Story Street, Essex, MA, USA

    The project website for the Essex Elementary School Building Project. This website will host everything related to the project along with all Massachusetts School Building Authority & School Building Committee documents. Welcome Please explore the page and click the "About" link below to learn more about the project! About Essex Elementary School Next Upcoming SBC Meeting SBC Meeting No. 15 Date: March 10, 2026 Time: 6:00PM https://us06web.zoom.us/j/86278873513 Check out some quick links below! Summary of Meetings This link will take you to a frequently updated list of meetings agendas, presentations, recordings, & minutes Master Calender This link will take you to a frequently updated list of all planned public meetings Monthly Reports This link will take you to the monthly report page - issued around the 12th of each month

  • Cost | Essex ES

    GASTOS Kasalukuyan naming tinatantya ang kabuuang gastos para sa proyekto na $21.6 milyon. Ang panghuling gastos sa badyet para sa proyekto ay kukumpletuhin sa panahon ng Schematic Design at ihaharap sa Konseho ng Lungsod para sa pag-apruba sa Taglagas ng 2021. KARAPAT-DAPAT VS. HINDI KARAPAT NA GASTOS Ang MSBA reimbursement ay 54.79% para sa anumanKARAPAT-DAPAT gastos. Mayroong ilang mga bagay sa proyekto na hindi karapat-dapat para sa reimbursement o lumampas sa pinakamataas na limitasyon ng pagiging karapat-dapat. Halimbawa, ang mga gastos sa site na higit sa 8% ay hindi karapat-dapat. Tinatantya namin ang ~ 40% na natanto na reimbursement pagkatapos makalkula ang mga karapat-dapat/hindi karapat-dapat na gastos.

  • Disenyo ng Proyekto at Mga Dokumento | Essex ES

    Mga Pagpupulong ng SBC Tingnan ang SBC Meeting Materials Mga Buwanang Ulat Tingnan ang mga Buwanang Ulat Kasalukuyang Kondisyon Tingnan ang Mga Kasalukuyang Kundisyon Project Documents View Project Documents

  • Preferred Schematic Report | Essex ES

    Preferred Schematic Report PSR is scheduled to begin in Winter 2026

  • Feasibility Study | Essex ES

    Feasibility Study The purpose of the Feasibility Study is for the District, its OPM (for projects with estimated construction costs in excess of $1.5 million), its Designer, and the MSBA to explore potential solutions that meet the requirements of the District’s Educational Program, and to determine the most cost effective and educationally appropriate solution for the MSBA Board of Directors' consideration. The Feasibility Study consists of the Preliminary Design Program (PDP) & The Preferred Schematic Report (PSR). Preliminary Design Program Key Goals Identify the issues/articulate the educational plan List options to be studied in PSR Generate an initial space summary Document existing conditions Establish design parameters View PDP Alternatives Preferred Schematic Report Key Goals Develop and evaluate alternatives. Recommend the most cost effective and educationally appropriate preferred solution to the MSBA Board of Directors for their consideration. View PSR Alternatives

  • Project Finances | Essex ES

    Mga Dokumento sa Pagtatantya ng PDP

  • Detailed Design | Essex ES

    Detailed Design & Construction Documents The District and its team continue to advance the project and the MSBA continues to monitor the project to ensure it remains on track and meets the expectation of both the District and the MSBA as defined in the Project Funding Agreement. In general terms, the MSBA ensures that the project team works within the requirements contained in the MSBA’s Base Contracts and Base Contract Amendments for Owner's Project Managers (OPM) and Designer Services . Additionally, the MSBA assigns a Commissioning Consultant to the project who facilitates an intensive quality assurance process and ensures that the new or renovated building operates efficiently and as the owner intended. Specifically, the District and its team generate construction documents which are reviewed by the MSBA in accordance with the requirements prescribed in the above-mentioned contracts.

  • News | Burlington High School

    Project milestones and important documents BALITA + IBA PANG IMPORMASYON Malapit na!

  • Existing Conditions | Essex Elementary School

    Existing school facility conditions and issues MGA KUMIGIL NA KUNDISYON 1/26 Habeeb Report - 2023

  • Community Outreach | Essex ES

    Pag-abot sa Komunidad 2025 Coming Soon!

  • FAQ | Essex Elementary School

    Frequently asked questions MADALAS Y NAGTANONG NG MGA TANONG ! Widget Didn’t Load Check your internet and refresh this page. If that doesn’t work, contact us.

Logo ng DW - Color_Combined Logo.png

© 2024  Burlington School District

bottom of page