top of page

Preliminary Design Program Alternatives

Please see below to view the proposed alternatives for the PDP. These consist of base building repairs, additions/renovations, & new construction options. These also span across both the current Essex Elementary School site and the Manchester Memorial Elementary School site along with covering multiple grade configurations

A1.2.jpg
A2.1.jpg
A2.2.jpg
B1.1.jpg
Logo ng DW - Color_Combined Logo.png

© 2024  Burlington School District

bottom of page