top of page

검색 결과

공란으로 28개 검색됨

  • Feasibility Study | Essex ES

    Feasibility Study The purpose of the Feasibility Study is for the District, its OPM (for projects with estimated construction costs in excess of $1.5 million), its Designer, and the MSBA to explore potential solutions that meet the requirements of the District’s Educational Program, and to determine the most cost effective and educationally appropriate solution for the MSBA Board of Directors' consideration. The Feasibility Study consists of the Preliminary Design Program (PDP) & The Preferred Schematic Report (PSR). Preliminary Design Program Key Goals Identify the issues/articulate the educational plan List options to be studied in PSR Generate an initial space summary Document existing conditions Establish design parameters View PDP Alternatives Preferred Schematic Report Key Goals Develop and evaluate alternatives. Recommend the most cost effective and educationally appropriate preferred solution to the MSBA Board of Directors for their consideration. View PSR Alternatives

  • MERSD Essex Elementary School Building Project

    Learn more about the Essex Elementary School building project. 환영 우리는 당신을 격려합니다 탐구하다 Burlington High School 프로젝트와 그것이 마을에 미치는 영향, 지역사회에 어떻게 참여하는지에 대한 추가 정보를 제공하는 웹사이트 에 대한 다가올 회의 벌링턴 고등학교 건축 위원회 제5차 회의 2024년 4월 11일 @ 오후 6시 30분 회의 링크: 에 발표됩니다.

  • Community Outreach | Essex ES

    지역 사회 아웃리치 2025 Coming Soon!

  • Preliminary Design Program | Essex ES

    예비 설계 프로그램 예비 설계 프로그램(PDP)은 타당성 조사 단계의 첫 단계로, 학구와 해당 팀이 협력하여 교육 프로그램을 문서화하고, 초기 공간 요약을 작성하고, 기존 조건을 문서화하고, 설계 매개변수를 확립하고, 대안을 개발 및 평가하고, PSR 단계에서 추가 평가를 위한 가장 비용 효율적이고 교육적으로 적합한 대안을 권장합니다. 1. 서론 2. 교육 프로그램 3. 초기 공간 요약 4. 기존 조건 평가 5. 사이트 개발 요구 사항 6. 대안의 예비 평가 7. 지역 활동 및 승인

DW 로고 - Color_Combined Logo.png

© 2024  벌링턴 교육구

bottom of page