- Cost | Essex ES
成本 我们目前估计该项目的总成本为 2160 万美元。该项目的最终预算成本将在方案设计期间完成,并于 2021 年秋季提交给市议会批准。 合格成本与不合格成本 MSBA 报销额为 54.79%,适用于任何有资格的 花费。 项目中有许多项目不符合报销条件或超出最高资格上限。例如,超过 8% 的场地费用不符合报销条件。 我们估计,计算符合条件/不符合条件的费用后,实际报销金额约为 40%。
- About | Essex Elementary School
关于 In January 2023, the MSBA (Massachusetts School Building Authority) recommended and approved the Essex Elementary School for admission into the Eligibility Phase of the MSBA grant process. Being accepted means the MERSD Essex Elementary School has been identified as being one of the neediest schools in the state (close to being out of options to address the structural issues of the building) and a good candidate for the grant program. The MSBA grant program provides technical assistance and financial support (a minimum of 30% reimbursement) for the planning and construction of a new/renovated school. Acceptance into the program comes at a critical time. In the fall of 2022, MERSD commissioned Habeeb & Associates to conduct a needs assessment of both facilities to provide a data-based resource to guide in the development of a timeline to address the replacement of Essex Elementary School. The results were reported to the community in November 2022 and clearly showed that Essex Elementary has passed its useful life. The study identified approximately $9 million in capital investments needed to maintain the aging facility. (Habeeb Report ’23 ) Essex Elementary School is a 67 year-old building that the MSBA has identified as “being “being almost out of options” to address structural deficiencies Obsolete architectural and mechanical systems contribute to excessive operational and maintenance costs Unfavorable learning environment with a leaking roof, single pane windows, outdated lighting, and ventilation/heating systems Inadequate size and inefficient arrangement of academic and administrative space with converted locker rooms and closets being used for office and instructional space and limited special education and meeting venues Instructional limitations due to the lack of appropriate instructional space Non-compliant handicapped accessibility Participation in the MSBA program will allow MERSD to work with the MSBA team of experts to conduct a feasibility study to determine the most cost-effective solution for providing a renovated/rebuilt facility. A Feasibility Study is Necessary Because: This is a requirement of the MSBA to qualify for state-funded reimbursement for any future building project, including renovation Creates a transparent process that investigates potential options and provides multiple solutions for the town to consider, including cost estimates and schematic designs for repair, renovation, or new construction Provides the school, town officials, and voters the facts needed to make educated decisions about the future of the school and, more importantly, the students it serves
- Preliminary Design Program | Essex ES
初步设计方案 初步设计方案 (PDP) 是可行性研究阶段的第一阶段,在此阶段,学区及其团队合作记录他们的教育计划,生成初步空间摘要,记录现有条件,建立设计参数,开发和评估替代方案并推荐最具成本效益和最适合教育的替代方案,以便在 PSR 阶段进行进一步评估。 1. 简介 2. 教育计划 3. 初始空间摘要 4. 现有条件评估 5. 场地开发要求 6. 替代方案的初步评估 7. 地方行动和批准