نتائج البحث
تم العثور على 30 نتيجة مع بحث فارغ
- Design Options & Site Context Plan | Essex ES
خيارات التصميم قريباً!
- Detailed Design | Essex ES
Detailed Design & Construction Documents The District and its team continue to advance the project and the MSBA continues to monitor the project to ensure it remains on track and meets the expectation of both the District and the MSBA as defined in the Project Funding Agreement. In general terms, the MSBA ensures that the project team works within the requirements contained in the MSBA’s Base Contracts and Base Contract Amendments for Owner's Project Managers (OPM) and Designer Services . Additionally, the MSBA assigns a Commissioning Consultant to the project who facilitates an intensive quality assurance process and ensures that the new or renovated building operates efficiently and as the owner intended. Specifically, the District and its team generate construction documents which are reviewed by the MSBA in accordance with the requirements prescribed in the above-mentioned contracts.
- Construction | Essex ES
Construction During construction, the District and its team continue to collaborate with the MSBA to report on the progress of the project and to confirm that it remains on schedule and within budget, and meets the expectation of both the District and the MSBA as defined in the Project Funding Agreement ("PFA"). Module 7 – Construction , provides information districts will need to: process Reimbursement Requests into the Pro-Pay System ; reconcile its Total Project Budget in an Amendment to the PFA to account for the actual construction costs based on executed bid/Guaranteed Maximum Price ("GMP"); and submit change orders and GMP Contingency Expenditures consideration for eligibility using the Change Order Review Log and the GMP Contingency Log . In addition to keeping the budget up to date in Pro-Pay, the District must also maintain an up-to-date project schedule, submitted monthly by the OPM together with the OPM Report. Within two weeks of the District’s approval of the General Contractor’s or Construction Manager’s construction schedule, the project schedule should be updated to contain all of the schedule activities required by Module 4 – Schematic Design, Section 4.1.2 , plus the additional enumerated Module 7 Schedule Activities . This project schedule must be kept up-to-date and submitted to the MSBA monthly with the OPM Report.
- Preferred Schematic Report | Essex ES
Preferred Schematic Report PSR is scheduled to begin in Winter 2026
- Preliminary Design Program | Essex ES
برنامج التصميم الأولي يعد برنامج التصميم الأولي (PDP) المرحلة الأولى من مرحلة دراسة الجدوى حيث يتعاون المنطقة وفريقها لتوثيق برنامجهم التعليمي، وإنشاء ملخص أولي للمساحة، وتوثيق الظروف الحالية، وإنشاء معايير التصميم، وتطوير وتقييم البدائل والتوصية بالبدائل الأكثر فعالية من حيث التكلفة والملاءمة التعليمية لمزيد من التقييم في مرحلة PSR. 1. المقدمة 2. البرنامج التعليمي 3. ملخص الفضاء الأولي 4. تقييم الظروف القائمة 5. متطلبات تطوير الموقع 6. التقييم الأولي للبدائل 7. الإجراءات والموافقات المحلية
